Challenge: Install 23 miles of 144 count fiber cable along I94 in existing conduit systems.
Strategy: The existing structures along the route could not be utilized. 57 new and holes had to be placed near the existing hand holes and one of the ducts breached and brought into the new hand hole. The existing conduit in some of the areas were deep and in inaccessible areas. PirTano had to develop ways to access these areas in order to complete construction.
Result: Most of the work was completed in the fall of 2018 with the final construction to be completed in the Spring of 2019.
Contract: $380,000